Dear all,
Since the upgrade of Cycle 49r1, I understood that the ENS control member and IFS deterministic run (HRES) were identical or the same run. However, in today’s clustering product for the second forecast group, the cluster was different for deterministic and control members. Why that?
Thank you in advance!
Alessio